In a significant crackdown on unauthorised construction, the Brihanmumbai Municipal Corporation (BMC) has filed an FIR against 27 residents of Mangesh Co-operative Housing Society in Kurla East, Mumbai. The FIR, registered at Nehru Nagar Police Station on June 13, 2025, accuses the residents of illegal modifications and extensions to their flats in violation of the Maharashtra Regional and Town Planning (MRTP) Act, 1966.

The complaint was filed by Karan Kumar Bapurao Animwar, Assistant Commissioner of the BMC’s East Suburbs Engineering Department. According to the complaint, the unauthorised alterations were carried out across several wings of the housing society, located in Kamgar Nagar, barely 1 km from the police station.


🔍 Details of Violations

The accused residents allegedly carried out a range of structural changes, including:

  • Illegal extension of balconies and front entrances
  • Construction of mezzanine floors and additional roofs
  • Conversion of open spaces into kitchens and toilets
  • Elevation of compound walls and terraces beyond approved norms

All the alterations were executed without any permission or sanction from the BMC, violating development control regulations and sanctioned building plans.


🏢 Timeline of Enforcement Action

  • Between June 2020 and April 2025, the BMC conducted multiple inspections and served notices under Section 53(1) of the MRTP Act, asking the residents to remove the unauthorised constructions.
  • Despite repeated warnings, no corrective action was taken by the residents.
  • Following continued non-compliance, a proposal was submitted to take legal action under Section 53(7) of the MRTP Act.
  • On receiving internal approvals, the FIR was formally registered.

👮 Legal Proceedings and Investigation

  • The First Information Report (FIR No. 0261) has been lodged under Section 53(7), which provides for penal action in cases of non-removal of unauthorised development even after notice.
  • The case has been handed over to PSI Arun Pushkar Kendre of Nehru Nagar Police Station for further investigation.
  • All 27 accused have been named in the FIR with flat and building details clearly mentioned.

🧾 Impact and Implications

This action marks one of the few instances where such a large group of individual flat owners have faced legal action collectively for violations within a single housing society. It reflects the BMC’s stricter stance on illegal construction and a push for greater compliance in residential colonies.

Sources within the BMC suggest that more such actions may follow as the civic body intensifies its enforcement drive against unauthorised construction in suburban Mumbai.

Also Read: BMC issues First Air Pollution Notice to a Developer

You May Also Like

Can Mumbai Police Finally Own Their Homes? Maharashtra Sets Up High-Level Panel to Study Ownership Rights in Police Colonies

Maharashtra government forms high-level committee to study whether Mumbai police housing colonies can be converted into ownership homes for police officers and staff.

CIDCO Begins Process to Develop India’s First Iconic Multi-Purpose Indoor Live Entertainment Arena in Navi Mumbai

CIDCO has launched the process to develop India’s first iconic multi-purpose indoor live entertainment arena in Navi Mumbai by issuing an EOI. Inspired by Madison Square Garden and The O₂ Arena, the venue will host 20,000–25,000 attendees and redefine India’s entertainment landscape.

Can Homebuyers Stop a Builder from Loading Additional FSI After Decades of Handing Over Possession? Court Says No

The Bombay High Court’s November 7, 2025, ruling allows Jaydeep Developers to build Wing C5 in Mumbai’s Lok Everest project, rejecting homebuyers’ objections. Citing 1993 disclosures, the court upheld the developer’s right to additional FSI, emphasizing timely action under MOFA.

Godrej Properties Acquires 3 Plots in Kharghar, But Many of 47 Auctioned by CIDCO Remain Untaken

Godrej Properties secures 3 prime plots in Kharghar through CIDCO’s auction, with a potential revenue of INR 3,500 crore. However, out of 40 plots auctioned, several remained unsold, indicating a possible slowdown in Navi Mumbai’s property market.