Key terms

  • Tenure: 11 months (1 November 2026 to 30 September 2027)
  • License / rent commencement: 1 November 2026
  • Fit-out / rent-free: 21 September 2026 to 31 October 2026
  • License fee: ₹5,00,000 a month, ₹55,00,000 paid in full in advance on 16 September 2026
  • Lock-in: entire 11-month licence period
  • CAM and property tax: included in the licence fee; borne by the licensor
  • Car parks: 2 reserved stilt parks
  • Premises: Offices 801 and 802, 8th floor, Lotus Grandeur, Veera Desai Road Ext., Andheri West

Nadiadwala Grandson Entertainment Private Limited has given offices 801 and 802 on the 8th floor of Lotus Grandeur, Andheri West, on an 11-month leave and licence to Rhea and Dia Enterprises Pvt. Ltd., according to the registered agreement provided by CRE Matrix, a real estate data analytics firm. The instrument was executed in Mumbai on 21 September 2026 and registered as MB113-20899-2026 at the Joint Sub-Registrar, Mumbai-13. Stamp duty of ₹27,500 and registration fee of ₹1,000 (total ₹28,500; GRN MH010555267202627E) were paid the same day. Document handling charges of ₹2,000 were paid by the licensor.

The licensor is Nadiadwala Grandson Entertainment Pvt. Ltd. (CIN U92100MH2005PTC152918; PAN AACCN0909J), registered at the 17th floor of the same Lotus Grandeur building, Off Veera Desai Road, Andheri West. It signed through authorised signatory Nusrat Javed Khan under a board resolution dated 18 September 2026. The licensee is Rhea and Dia Enterprises Pvt. Ltd. (CIN U55101MH2026PTC468475), registered at Office C/210, 2nd Floor, Crystal Plaza, New Link Road, Oshiwara, Andheri West, signed through Sagar Prakash Bhosle.

The premises

The licensed units are offices 801 and 802 on the 8th floor of Lotus Grandeur, on CTS No. 737/9/12/C-D, Village Oshiwara, Taluka Andheri, Veera Desai Road Extension, Andheri West, Mumbai 400053, together with two reserved stilt-level car parks. The licence is for commercial office use, on an as-is-where-is basis, and is expressed as a personal permission that does not create tenancy.

Period and fee

The licence runs 11 months from 1 November 2026 to 30 September 2027. Fit-out from the execution date of 21 September 2026 through 31 October 2026 is rent-free. Occupation and fee both start on 1 November 2026.

The licensee has already paid the full 11-month fee of ₹55 lakh (₹5 lakh a month, including TDS) by NEFT/RTGS on 16 September 2026. GST on the fee is extra and stays with the licensee. Property tax and society or condominium maintenance are built into that fee and stay with the licensor. Electricity, internet, telephone and other utilities are paid by the licensee at actuals, including during fit-out.

Lock-in

The entire 11-month term is the lock-in. Neither side may terminate during that period except the licensor under the default clause. If the agreement is ended during lock-in, the prepaid fee is not refunded. Renewal, if both sides agree, needs a fresh registered deed.

This 801–802 take sits on the same 8th floor of Lotus Grandeur as the longer 803–804 licence between the same two companies. An 11-month prepaid ₹55 lakh licence, CAM bundled into the fee and a full-term lock-in is now on the public registration record circulated by CRE Matrix.

Also Read: 21 Acres of land sold in Thane for ₹471 Crore

You May Also Like

Leave & License registration, Mumbai prefers it online

Leave and license agreements registered in Mumbai in the first four months…

Realty Stocks Surge as Iran-Oman Hormuz Joint Statement Goes Live; Crude Set to Crash

Realty stocks surge August 24 as Iran and Oman formally publish the Hormuz joint statement. Crude set to fall sharply — sector eyes the 1,009 CY26 high.

Court Strikes Down Maharashtra’s Attempt to Halve Compensation for National Highway Acquisitions – “Centre’s Rule Prevails, You Get Double!”

In a major relief for landowners, the Bombay High Court has struck down Maharashtra’s notifications and GRs that tried to cap the compensation multiplier at 1.00 for national highway projects, upholding the Central Government’s 2.00 factor and ordering a fresh, higher award within six weeks.

India’s Steel Scrap Demand Set to Surge as Capacity Expansion Accelerates: MRAI Pushes for GST Cut and Policy Reforms

India’s steel scrap demand is expected to surge as the country moves towards 300 million tonnes of steel capacity by 2030. At IMRC 2026, policymakers and industry leaders stressed the need for GST cuts, stronger EPR enforcement and policy reforms to formalise recycling and support sustainable steelmaking.