Piling Work on Elphinstone Bridge Stalled After Residents Raise Safety Concerns
Piling work on the Elphinstone Bridge redevelopment project was halted after nearly 50 residents protested, citing fear that vibrations could damage their century-old buildings. MMRDA and VJTI experts have now stepped in with real-time vibration monitoring and safety measures to reassure locals.