<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>public transport Archives - Square Feat India</title>
	<atom:link href="https://squarefeatindia.com/tag/public-transport/feed/" rel="self" type="application/rss+xml" />
	<link>https://squarefeatindia.com/tag/public-transport/</link>
	<description>Real Estate News Website</description>
	<lastBuildDate>Thu, 20 Mar 2025 10:37:40 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.9.4</generator>

<image>
	<url>https://squarefeatindia.com/wp-content/uploads/2019/12/squrefeatindia_favicon.png</url>
	<title>public transport Archives - Square Feat India</title>
	<link>https://squarefeatindia.com/tag/public-transport/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Maharashtra Government Allocates Rs 19.50 Crore for Mumbai Metro Line-5 Project</title>
		<link>https://squarefeatindia.com/maharashtra-government-allocates-rs-19-50-crore-for-mumbai-metro-line-5-project/</link>
		
		<dc:creator><![CDATA[SquareFeatIndia]]></dc:creator>
		<pubDate>Thu, 20 Mar 2025 10:37:39 +0000</pubDate>
				<category><![CDATA[Infrastructure]]></category>
		<category><![CDATA[Bhiwandi Metro]]></category>
		<category><![CDATA[infrastructure development]]></category>
		<category><![CDATA[Kalyan Metro]]></category>
		<category><![CDATA[Maharashtra Government]]></category>
		<category><![CDATA[Maharashtra Urban Development]]></category>
		<category><![CDATA[Metro Rail Project]]></category>
		<category><![CDATA[MMRDA]]></category>
		<category><![CDATA[Mumbai Metro Line-5]]></category>
		<category><![CDATA[public transport]]></category>
		<category><![CDATA[Soft Loan]]></category>
		<category><![CDATA[State Funding]]></category>
		<category><![CDATA[Thane Metro]]></category>
		<category><![CDATA[urban development]]></category>
		<guid isPermaLink="false">https://squarefeatindia.com/?p=8879</guid>

					<description><![CDATA[<p>The Maharashtra Government has sanctioned ₹19.50 crore as a soft loan for the Mumbai Metro Line-5 (Thane-Kalyan-Bhiwandi) project under MMRDA. This funding aims to accelerate metro construction, improve urban transport connectivity, and facilitate economic growth in the region. The government has allocated this amount under the 2024-25 budget, ensuring smoother execution of this crucial infrastructure project.</p>
<p>The post <a href="https://squarefeatindia.com/maharashtra-government-allocates-rs-19-50-crore-for-mumbai-metro-line-5-project/">Maharashtra Government Allocates Rs 19.50 Crore for Mumbai Metro Line-5 Project</a> appeared first on <a href="https://squarefeatindia.com">Square Feat India</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p><em>Mumbai, March 19, 2025:</em> The Maharashtra government has sanctioned Rs 19.50 crore as a soft loan to the Mumbai Metropolitan Region Development Authority (MMRDA) for the implementation of the Mumbai Metro Line-5 project, which connects Thane, Kalyan, and Bhiwandi. This funding is part of the state’s continued commitment to advancing metro rail infrastructure in the Mumbai Metropolitan Region (MMR).</p>



<h3 class="wp-block-heading"><strong>Project Background</strong></h3>



<p>The Mumbai Metro Line-5 project was approved by the state government on December 21, 2017. The project is being executed by the MMRDA, with financial support from both the central and state governments. The total financial model includes a 50% contribution from the central government, full funding for state-level and municipal taxes, and land-related expenses.</p>



<p>To support the implementation of this project, the Maharashtra government has allocated Rs. 1352.25 crore as a long-term soft loan to MMRDA. The repayment of this loan is expected to be managed by MMRDA from the revenues generated through the execution of the project.</p>



<h3 class="wp-block-heading"><strong>Current Financial Allocation</strong></h3>



<p>For the financial year 2024-25, the Maharashtra government had earmarked Rs. 65 crore under the budgetary provision for Mumbai Metro Line-5. Of this, Rs. 19.50 crore will now be disbursed as a soft loan to MMRDA.</p>



<p>The funding will be provided under the budgetary demand item <strong>&#8220;6217 &#8211; Urban Development Loans&#8221;</strong> and categorized under <strong>&#8220;Mumbai Metro Line-5 Project Loan Assistance.&#8221;</strong> The disbursed amount is designated as non-refundable financial assistance.</p>



<h3 class="wp-block-heading"><strong>Loan Utilization and Repayment</strong></h3>



<ul class="wp-block-list">
<li>MMRDA will be responsible for ensuring the utilization of the soft loan for expenses related to the Metro Line-5 project.</li>



<li>The soft loan amount will be used for central and state taxes, land-related expenses, and other operational costs.</li>



<li>The state government has mandated that MMRDA repay the soft loan once the project generates revenue and covers its external borrowings.</li>



<li>In case the government decides to impose interest on the loan, MMRDA will be required to repay it along with the principal amount in a single installment post project completion.</li>
</ul>



<h3 class="wp-block-heading"><strong>Past Financial Support for Mumbai Metro Line-5</strong></h3>



<p>The Maharashtra government has been consistently allocating financial aid to the project since 2022. The disbursement history is as follows:</p>



<figure class="wp-block-table"><table class="has-fixed-layout"><thead><tr><th>Date</th><th>Amount (Rs. Crore)</th><th>Total Cumulative Amount (Rs. Crore)</th></tr></thead><tbody><tr><td>25-08-2022</td><td>21.00</td><td>21.00</td></tr><tr><td>21-03-2023</td><td>14.00</td><td>35.00</td></tr><tr><td>04-07-2023</td><td>12.00</td><td>47.00</td></tr><tr><td>29-08-2023</td><td>18.00</td><td>65.00</td></tr><tr><td>05-03-2024</td><td>30.00</td><td>95.00</td></tr><tr><td>24-06-2024</td><td>21.66</td><td>116.66</td></tr><tr><td>24-12-2024</td><td>23.83</td><td>140.50</td></tr><tr><td>19-03-2025</td><td>19.50</td><td>160.00</td></tr></tbody></table></figure>



<p>With this latest installment, the cumulative financial aid provided by the Maharashtra government to MMRDA for Metro Line-5 has reached Rs. 160 crore.</p>



<h3 class="wp-block-heading"><strong>Future Considerations</strong></h3>



<ul class="wp-block-list">
<li>The Maharashtra government will continue monitoring the financial requirements of the project and provide assistance as necessary.</li>



<li>MMRDA must maintain separate financial records for the disbursed loan and submit periodic expenditure reports to the government.</li>



<li>The loan utilization must adhere to state guidelines, and the funds cannot be diverted to other projects.</li>
</ul>



<h3 class="wp-block-heading"><strong>Conclusion</strong></h3>



<p>The Mumbai Metro Line-5 is a crucial infrastructure project aimed at improving public transport connectivity in the MMR region. The government’s continued financial assistance demonstrates its commitment to ensuring timely project completion and efficient urban mobility. The allocation of Rs. 19.50 crore underlines the government’s long-term vision of expanding metro connectivity and easing transportation challenges in Mumbai and its surrounding areas.</p>



<p>Also Read: <a href="https://squarefeatindia.com/tag/mumbai-metropolitan-region-development-authority-mmrda/">Mumbai Metropolitan Region Development Authority (MMRDA)</a></p>
<p>The post <a href="https://squarefeatindia.com/maharashtra-government-allocates-rs-19-50-crore-for-mumbai-metro-line-5-project/">Maharashtra Government Allocates Rs 19.50 Crore for Mumbai Metro Line-5 Project</a> appeared first on <a href="https://squarefeatindia.com">Square Feat India</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Double-Decker Flyover Inaugurated in Mira Bhayander to Improve Connectivity</title>
		<link>https://squarefeatindia.com/double-decker-flyover-inaugurated-in-mira-bhayander-to-improve-connectivity/</link>
		
		<dc:creator><![CDATA[SquareFeatIndia]]></dc:creator>
		<pubDate>Sat, 15 Mar 2025 11:15:37 +0000</pubDate>
				<category><![CDATA[Infrastructure]]></category>
		<category><![CDATA[double-decker flyover]]></category>
		<category><![CDATA[Metro Line-9]]></category>
		<category><![CDATA[Mira Bhayander]]></category>
		<category><![CDATA[MMRDA]]></category>
		<category><![CDATA[Mumbai]]></category>
		<category><![CDATA[public transport]]></category>
		<category><![CDATA[road connectivity]]></category>
		<category><![CDATA[sustainable transport]]></category>
		<category><![CDATA[traffic management]]></category>
		<category><![CDATA[urban infrastructure]]></category>
		<guid isPermaLink="false">https://squarefeatindia.com/?p=8830</guid>

					<description><![CDATA[<p>MMRDA has inaugurated a double-decker flyover in Mira Bhayander as part of Metro Line-9, designed to decongest major traffic bottlenecks and improve road connectivity. Built with a shared pier structure, the 850-meter-long flyover enhances urban mobility by integrating metro and road transport. The project is expected to reduce travel time, improve traffic flow, and support sustainable transport solutions in one of Mumbai’s fastest-growing suburbs.</p>
<p>The post <a href="https://squarefeatindia.com/double-decker-flyover-inaugurated-in-mira-bhayander-to-improve-connectivity/">Double-Decker Flyover Inaugurated in Mira Bhayander to Improve Connectivity</a> appeared first on <a href="https://squarefeatindia.com">Square Feat India</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p><strong>Mumbai, March 8, 2025:</strong> The Mumbai Metropolitan Region Development Authority (MMRDA) has inaugurated a <strong>double-decker flyover</strong> in Mira Bhayander, a major infrastructure project aimed at reducing congestion and improving urban mobility. The flyover, which is part of <strong>Metro Line-9</strong>, extends from Sai Baba Nagar Metro Station near S.K. Stone Junction to Shivar Garden.</p>



<p>The project was inaugurated by Deputy Chief Minister Eknath Shinde, with Transport Minister Pratap Sarnaik and officials from Maha Metro and the Mira Bhayander Municipal Corporation (MBMC) in attendance. The flyover has been constructed using a <strong>shared pier structure</strong>, integrating metro and road transport infrastructure on the same pillars for the first time.</p>



<h3 class="wp-block-heading"><strong>Key Features of the Flyover:</strong></h3>



<ul class="wp-block-list">
<li><strong>Total length:</strong> 850 meters</li>



<li><strong>Shared piers with Metro Line-9:</strong> 21</li>



<li><strong>Up ramp length:</strong> 122.6 meters</li>



<li><strong>Down ramp length:</strong> 153 meters</li>



<li><strong>Carriageway width:</strong> 17 meters, providing 2+2 lanes for smooth traffic movement</li>
</ul>



<h3 class="wp-block-heading"><strong>Traffic and Connectivity Impact</strong></h3>



<p>The flyover is expected to <strong>ease congestion at three major traffic bottlenecks</strong>—S.K. Stone Junction, Kanakia Junction, and Shivar Garden Junction. It aims to <strong>reduce travel time, improve traffic flow, and decrease fuel consumption</strong>, contributing to a more sustainable urban transport system.</p>



<p>The project is part of <strong>MMRDA’s broader Metro Line-9 initiative</strong>, which includes three flyovers designed to improve connectivity:</p>



<ul class="wp-block-list">
<li><strong>Flyover 1 (Pleasant Park to Silver Park Signal)</strong> – Operational since August 2024</li>



<li><strong>Flyover 2 (Inaugurated today)</strong></li>



<li><strong>Flyover 3 (Expected completion by August 2025)</strong></li>
</ul>



<h3 class="wp-block-heading"><strong>Engineering and Safety Features</strong></h3>



<p>The flyover incorporates <strong>several safety and efficiency measures</strong>, including:</p>



<ul class="wp-block-list">
<li><strong>Reinforced concrete anti-crash barriers</strong> for vehicle protection</li>



<li><strong>Reflective signage, lane markings, and speed limit indicators</strong> for smooth navigation</li>



<li><strong>An advanced drainage system</strong> to prevent water accumulation</li>



<li><strong>Rumble strips and speed breakers at ramps</strong> to regulate vehicle speed</li>



<li><strong>Light poles at 25-meter intervals</strong> to ensure better visibility for night travel</li>
</ul>



<h3 class="wp-block-heading"><strong>Urban Mobility and Future Plans</strong></h3>



<p>The integration of road and metro infrastructure is expected to enhance connectivity for <strong>Mira Bhayander’s growing population</strong>. With metro services set to begin on the second deck of the structure, the area is likely to witness further development in urban transport solutions.</p>



<p>Officials from MMRDA emphasized that this project represents a <strong>forward-looking approach to infrastructure development</strong>, balancing efficiency, sustainability, and advanced engineering. The flyover is expected to serve as a model for similar projects in other rapidly urbanizing areas.</p>



<p>The completion of this double-decker flyover marks a significant milestone in Mumbai’s infrastructure development, addressing long-standing traffic issues while supporting <strong>integrated and efficient transport solutions</strong>.</p>



<p>Also Read: <a href="https://squarefeatindia.com/tag/delhi-infrastructure-projects/">Delhi infrastructure projects</a></p>
<p>The post <a href="https://squarefeatindia.com/double-decker-flyover-inaugurated-in-mira-bhayander-to-improve-connectivity/">Double-Decker Flyover Inaugurated in Mira Bhayander to Improve Connectivity</a> appeared first on <a href="https://squarefeatindia.com">Square Feat India</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>CIDCO Slashes Metro Fares by Up to 33% Effective September 7, 2024</title>
		<link>https://squarefeatindia.com/cidco-slashes-metro-fares-by-up-to-33-effective-september-7-2024/</link>
		
		<dc:creator><![CDATA[SquareFeatIndia]]></dc:creator>
		<pubDate>Thu, 05 Sep 2024 16:11:20 +0000</pubDate>
				<category><![CDATA[Infrastructure]]></category>
		<category><![CDATA[Belapur-Pendhar Metro]]></category>
		<category><![CDATA[CIDCO]]></category>
		<category><![CDATA[fare structure]]></category>
		<category><![CDATA[Metro fare reduction]]></category>
		<category><![CDATA[Metro news]]></category>
		<category><![CDATA[Navi Mumbai]]></category>
		<category><![CDATA[navi mumbai metro]]></category>
		<category><![CDATA[public transport]]></category>
		<category><![CDATA[Vijay Singhal]]></category>
		<guid isPermaLink="false">https://squarefeatindia.com/?p=7723</guid>

					<description><![CDATA[<p>CIDCO has reduced Metro fares for the Belapur-Pendhar Corridor by up to 33%, effective September 7, 2024. The new fares will be ₹10 to ₹30, replacing the previous ₹40 maximum fare. This move is designed to enhance affordability and accessibility for commuters.</p>
<p>The post <a href="https://squarefeatindia.com/cidco-slashes-metro-fares-by-up-to-33-effective-september-7-2024/">CIDCO Slashes Metro Fares by Up to 33% Effective September 7, 2024</a> appeared first on <a href="https://squarefeatindia.com">Square Feat India</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>In a significant move to make public transport more affordable, the City and Industrial Development Corporation (CIDCO) has announced a reduction in Metro fares for the Belapur-Pendhar Metro Corridor. The revised fare structure, set to take effect from September 7, 2024, will see a reduction of up to 33%, with the minimum fare dropping to Rs. 10 and the maximum fare to Rs. 30.</p>



<p>Vijay Singhal, VC &amp; MD of CIDCO, stated, “To ensure that more and more commuters can benefit from the fast and comfortable Metro service, we have reduced the ticket fares. This new fare structure will advantage both short and long-distance travelers. I encourage the people of Navi Mumbai to continue their positive response to the Metro service and take full advantage of it.”</p>



<figure class="wp-block-image size-large"><img fetchpriority="high" decoding="async" width="1024" height="503" src="https://squarefeatindia.com/wp-content/uploads/2024/09/image-1024x503.png" alt="" class="wp-image-7725" srcset="https://squarefeatindia.com/wp-content/uploads/2024/09/image-1024x503.png 1024w, https://squarefeatindia.com/wp-content/uploads/2024/09/image-300x147.png 300w, https://squarefeatindia.com/wp-content/uploads/2024/09/image-768x377.png 768w, https://squarefeatindia.com/wp-content/uploads/2024/09/image-800x393.png 800w, https://squarefeatindia.com/wp-content/uploads/2024/09/image.png 1096w" sizes="(max-width: 1024px) 100vw, 1024px" /></figure>



<p>Under the new fare system, tickets will be priced at Rs. 10 for distances up to 2 km and between 2 to 4 km, Rs. 20 for distances between 4 to 6 km and 6 to 8 km, and Rs. 30 for distances from 8 to 10 km and beyond. Previously, a ticket from Belapur Terminal to Pendhar was Rs. 40, which has now been reduced to Rs. 30.</p>



<p>Also Read: <a href="https://squarefeatindia.com/cidco-files-complaint-against-dumper-owner-and-driver-for-illegal-dumping/">CIDCO Files Complaint Against Dumper Owner and Driver for Illegal Dumping</a></p>



<p>The Navi Mumbai Metro Corridor No. 1, which spans from Belapur to Pendhar, is part of the broader Navi Mumbai Metro project developed by CIDCO. This corridor has significantly improved connectivity to key areas such as CBD, Taloja MIDC, and CIDCO’s housing complexes in Kharghar. The Metro services on this line commenced on November 17, 2023, and have been well-received by commuters.</p>
<p>The post <a href="https://squarefeatindia.com/cidco-slashes-metro-fares-by-up-to-33-effective-september-7-2024/">CIDCO Slashes Metro Fares by Up to 33% Effective September 7, 2024</a> appeared first on <a href="https://squarefeatindia.com">Square Feat India</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>MMRDA Seeks Maharashtra Government Guarantee for ₹14,000 Crore Infrastructure Bonds</title>
		<link>https://squarefeatindia.com/mmrda-seeks-maharashtra-government-guarantee-for-%e2%82%b914000-crore-infrastructure-bonds/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 04 Sep 2024 11:31:08 +0000</pubDate>
				<category><![CDATA[Infrastructure]]></category>
		<category><![CDATA[bond issuance]]></category>
		<category><![CDATA[development projects]]></category>
		<category><![CDATA[Economic Growth]]></category>
		<category><![CDATA[government guarantee]]></category>
		<category><![CDATA[infrastructure bonds]]></category>
		<category><![CDATA[infrastructure funding]]></category>
		<category><![CDATA[infrastructure investment]]></category>
		<category><![CDATA[integrated transportation hubs]]></category>
		<category><![CDATA[Maharashtra Government]]></category>
		<category><![CDATA[metro rail expansion]]></category>
		<category><![CDATA[MMRDA]]></category>
		<category><![CDATA[Mumbai development]]></category>
		<category><![CDATA[Mumbai Metropolitan Region]]></category>
		<category><![CDATA[Mumbai projects]]></category>
		<category><![CDATA[Mumbai Real Estate]]></category>
		<category><![CDATA[public transport]]></category>
		<category><![CDATA[road development]]></category>
		<category><![CDATA[transportation upgrades]]></category>
		<category><![CDATA[urban infrastructure]]></category>
		<category><![CDATA[urban mobility]]></category>
		<category><![CDATA[urban planning]]></category>
		<guid isPermaLink="false">https://squarefeatindia.com/?p=7696</guid>

					<description><![CDATA[<p>MMRDA has requested a ₹14,000 crore guarantee from the Maharashtra government to issue infrastructure bonds aimed at funding major urban and transportation projects in Mumbai.</p>
<p>The post <a href="https://squarefeatindia.com/mmrda-seeks-maharashtra-government-guarantee-for-%e2%82%b914000-crore-infrastructure-bonds/">MMRDA Seeks Maharashtra Government Guarantee for ₹14,000 Crore Infrastructure Bonds</a> appeared first on <a href="https://squarefeatindia.com">Square Feat India</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p><strong>Mumbai, September 4, 2024</strong> — The Mumbai Metropolitan Region Development Authority (MMRDA) has formally requested a guarantee from the Maharashtra government for issuing infrastructure bonds worth ₹14,000 crore. This financial move is aimed at accelerating the development of critical infrastructure projects in the Mumbai Metropolitan Region (MMR), which includes significant urban expansion and transportation upgrades.</p>



<p><strong>Objective of the Bonds</strong></p>



<p>The proposed bonds are intended to fund a variety of infrastructure initiatives that are crucial for enhancing the urban landscape of Mumbai and its surrounding areas. These projects include the construction of new roads, expansion of the metro rail network, and the development of integrated transportation hubs, all of which are pivotal for managing the city’s rapid growth and improving public services.</p>



<p><strong>Government Guarantee</strong></p>



<p>The request for a government guarantee underscores the MMRDA&#8217;s commitment to securing the necessary funding for these high-priority projects. By seeking this guarantee, the MMRDA aims to ensure investor confidence and secure favorable terms for the bond issuance. A government-backed guarantee would provide the financial security needed to attract a wide range of investors, facilitating the swift mobilization of capital required for the infrastructure developments.</p>



<p><strong>Infrastructure Projects</strong></p>



<p>The funds raised through these bonds will be directed towards several key projects, including:</p>



<ul class="wp-block-list">
<li><strong>Metro Rail Expansion:</strong> Extending existing metro lines and adding new routes to improve connectivity across the MMR.</li>



<li><strong>Road Development:</strong> Upgrading major roadways and constructing new roads to alleviate traffic congestion and enhance urban mobility.</li>



<li><strong>Integrated Transportation Hubs:</strong> Developing multi-modal transportation hubs to streamline transit services and improve efficiency.</li>
</ul>



<p>These projects are expected to significantly enhance the quality of urban infrastructure, support economic growth, and improve the overall quality of life for residents of Mumbai and the broader metropolitan area.</p>



<p><strong>Impact on Mumbai’s Development</strong></p>



<p>The successful issuance of these bonds would mark a substantial step forward in the MMRDA&#8217;s ongoing efforts to modernize Mumbai&#8217;s infrastructure. The projects funded by these bonds are anticipated to address some of the pressing challenges faced by the city, including traffic congestion, inadequate public transport options, and urban sprawl.</p>



<p>Also Read: <a href="https://squarefeatindia.com/mmrda-gives-13000-homes-for-quarantine-purposes/">MMRDA gives 13,000 homes for quarantine purposes</a></p>



<p><strong>Next Steps</strong></p>



<p>The Maharashtra government’s response to the MMRDA’s request will be closely watched, as it will determine the timeline and execution of the proposed infrastructure projects. If the guarantee is granted, the MMRDA will proceed with the bond issuance process, setting the stage for a series of transformative developments across the region.</p>



<p><strong>Broader Implications</strong></p>



<p>This move aligns with broader urban development strategies aimed at fostering sustainable growth and enhancing the efficiency of public services in rapidly expanding metropolitan areas. By securing the necessary funding through government-backed bonds, the MMRDA is positioning itself to drive significant advancements in infrastructure, ultimately benefiting the region’s residents and supporting its long-term growth.</p>
<p>The post <a href="https://squarefeatindia.com/mmrda-seeks-maharashtra-government-guarantee-for-%e2%82%b914000-crore-infrastructure-bonds/">MMRDA Seeks Maharashtra Government Guarantee for ₹14,000 Crore Infrastructure Bonds</a> appeared first on <a href="https://squarefeatindia.com">Square Feat India</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
