Survey of cessed buildings located in South Mumbai is carried out every year before monsoon. However, this year, it got hampered because of Corona and Lockdown

By Varun Singh

Mumbai city has close to 16,000 cessed buildings and all of them are in South of the city. Every year MHADA’s Repair and Reconstruction board carries out a survey.

This survey is carried out before monsoon and a list of most dangerous buildings is declared by MHADA.

The survey is carried out a few months before monsoon and by mid May or towards the end of the May the list is declared.

Residents of buildings declared as most dangerous to reside, are shifted to transit accommodation.

However, this year, as the lockdown came into force in March and has been extended till May 17 thus the survey got hampered.

Satish Lokhande, Chief Officer, Repair and Reconstruction Board confirmed that. But he also assured that everything is taken care of and there’s no need to worry.

“Our engineers are available 24 hours. We even came out with a public notice in newspapers informing people with mobile numbers of concerned officials. These numbers can be contacted by residents of such building whenever they feel there’s a danger,” said Lokhande.

The call centre of MHADA is working non stop, and whenever MHADA receives a call the staff attends and fixes the problem.

For example, recently MHADA received a call from a building in Dadar west. One of the apartments on the third floor of the building named Ambulkar Sadan had some problem.

A room from cessed building in Dadar where portion of ceiling cover collapsed.
A room from cessed building in Dadar where portion of ceiling cover collapsed.

A small portion of the ceiling cover came down. Post which MHADA officials were asked to fix it. They were asked to get rid of the loose portions carry out propping and other steps were taken.

Lokhande also said that, the officials keep visiting the buildings and hence have a fair idea of dilapidated buildings. He has made a separate WhatsApp group of engineers who have been asked to be available throughout.

Any building which the authorities find needs repair and needs to be vacated, action will be taken accordingly. Regular repair is being carried out of buildings that are in need of repair.

The authorities say people wherever required will be shifted to transit accommodation too.

Every year buildings collapse in Mumbai and kill scores of people. Most of these buildings that come down like a pack of cards are cessed buildings. They are very old most of them close to a hundred years old.

Also Read: MHADA puts 625 Mumbai homes for quarantine

Leave a Reply
You May Also Like

Goyal’s ‘reduce price’ advice doesn’t go down well

Goyal’s advice to developers to reduce price hasn’t gone down well with…

New Government Mandate: No more middlemen for rent agreements!

The government of Maharashtra has issued a new circular, effective immediately, canceling the appointment of all Authorized Service Providers (ASPs) for online Leave and License registration. This move aims to simplify the process for citizens and eliminate intermediaries, but it also places new responsibilities on tenants and landlords.

Realty Stocks Open Cautious as Markets Consolidate; Stock-Specific Moves Dominate Early Trade

Real estate stocks opened on a cautious note as Indian markets showed signs of consolidation. While select large developers saw mild gains, broader weakness in mid-caps points to a range-bound and stock-specific trading session ahead.

Stamp Duty Hike Fails To Slow Realty Sales

Stamp Duty from January 1, 2021 was hiked to 3% from 2%,…